Northcorp Recovery A former distribution center located in a popular Melbourne logistics hub, this project footprint was over 250,000m2 and at its highest point stood at a colossal 30m high. Mann used over 17 excavators simultaneously working with various hydraulic attachments, we were able to remove up to 150 loads per day. A state-of-the-art number plate tracking system was put in place along with a weight bridge, allowing the smooth flow of trucks throughout the project and a back to base system providing live minute update on tracking. Due to the sheer height of the fully automated shed, carefully designed and calculated structural pre-weakening was applied to perform a successful engineered induced collapse. Mann is providing its whole scope of services to this project, from our Demolition Consulting Services at planning stage through to site remediation at demolition completion.